Post Profile

Great Lakes Launch Hopper Dredge Ellis Island

Great Lakes Dredge & Dock Corporation announced today the successful launch of the Ellis Island, the barge component of its Articulated Tug & Barge (ATB) hopper dredge currently under construction. The launch occurred on September 30, 2016 at Eastern Shipbuilding’s shipyard in Allanton, Florida.
read more


Related Posts

Eastern Shipbuilding Start Construction of Dredge Barge ATB for Great Lakes

Vehicles / Watercraft :

  Eastern Shipbuilding is pleased to announce that on, Monday, September 15, 2014, Great Lakes Dredge & Dock Company, LLC  and Eastern Shipbuilding Group, Inc.

Signal Demands Arbitration on GLDD Design Modifications

Vehicles / Watercraft :

Signal International, Inc., announced that work toward the design of an Articulated Tug/Barge Hopper Dredge for Great Lakes Dredge and Dock (GLDD) has been discontinued.

Great Lakes Dredge & Dock Issues Major Vessel Contracts

Vehicles / Watercraft :

Great Lakes Dredge & Dock Corp. contracts Signal International for construction of hopper barge & tugboat. Great Lakes Dredge & Dock Corporation the

Signal International Lands Hopper Dredge Deal

Vehicles / Watercraft :

Signal International, Inc., has landed a $94 million contract from Great Lakes Dredge & Dock Corporation, (GLDD) to build an Articulated Tug & Barge ("ATB")

Robert Alan Designed ATB Tugs for ITB Marine

Vehicles / Watercraft :

The ITB Marine Group Ltd. (ITB) is currently well into construction of the first of two, twin Z-drive, ATB pusher tugs for service on the West Coast of North America. The tugs are being built at their Annacis Island Shipyard near Va...


Copyright © 2016 Regator, LLC