Post Profile

Lifetime Assessment for Deepwater Moorings

Mooring integrity is an important concern in the offshore industry [1]. Mooring leg failures can have  significant consequences, such as temporary shutdowns and require unplanned, thus expensive, repairs. On the other hand, an over dimensioned…
read more


Related Posts

First Subsea Awarded Heidelberg Spar Mooring Connector Contract

Vehicles / Watercraft :

Deepwater mooring specialist, First Subsea Ltd has been awarded a contract by Technip Inc to supply the subsea mooring connectors for a 23,000-ton truss spar platform moored in 5,

Petrobras Awards Lankhorst Ropes Dyneema Deepwater Mooring Line Contract

Vehicles / Watercraft :

Leading deepwater rope manufacturer, Lankhorst Ropes, has secured the first-ever, worldwide order for Dyneema synthetic mooring rope for deepwater MODU (Mobile

Mooring Inspection is Critical for Ageing Assets, says Welaptega

Vehicles / Watercraft :

Failures of mooring systems in offshore floating production are not easy to predict, but they do occur, and they will happen more often as infrastructure nears the end of design life.

Mooring Integrity Monitoring: BMT Answers the Challenge

Vehicles / Watercraft :

The need for mooring integrity monitoring has of late come back under the spotlight, not least because the use of floating production systems in the offshore oil

Lankofirst Debuts Fiber Rope Connector for Deepwater Mooring

Vehicles / Watercraft :

Lankhorst Ropes Offshore Division (LROD) announced the latest results of offshore trials of its Lankofirst synthetic fiber rope mooring connector on booth 1517 at OTC 2013.


Copyright © 2016 Regator, LLC