Post Profile

Metro track repairs create crushing waits for the Red Line

On Oct. 12, Metro workers rushed to repair defective or cracked sections of rail on the Red Line, but crowds were packed into stations waiting for trains for up to an hour during rush hour.
read more


Related Posts

IL: Metro Rushing to Restore Light Rail Before Rush Hour

Industries / Transportation : MassTransit

As of mid-afternoon Wednesday, Metro Transit workers were still trying to make repairs to the light-rail system delayed during the morning rush by fallen power lines.

Trains sharing a track on Metro's Red line

United States / Washington D.C. : Post Now

Trains sharing a track on Metro's Red Line because of 'unscheduled' track repair outside the Rhode Island Avenue stop. Single-tracking is between Rhode Island Avenue and NoMa-Gallaudet stops.

Delays on Metro's Orange and Silver lines, creates long waits and crowded stations

United States / Washington D.C. : Washington Post: Local

Metro trains are sharing a track on the Orange and Silver lines between Ballston and Courthouse stations.

Metro Says Tracks Not to Blame in Red Line Fire

United States / Washington D.C. : DCist

Investigators are still going through the debris left by the fire underneath a Red Line train at the Silver Spring Metro station that crippled last night's rush hour. [ more › ]

Day 5: Metro's SafeTrack marks first full work week of major repair efforts

United States / Washington D.C. : Washington Post: Local

Day 5: Metro's SafeTrack program hits its fifth work day. The week has not had any major hiccups but riders have dealt with long waits for trains and shuttle buses. Ridership is down at impacted stations and rail lines.


Copyright © 2016 Regator, LLC